Track record / Passage story

Passage story · May 2025

Hong Kong to Kaohsiung on a 40 ft performance trimaran.

A delivery east across the northern South China Sea in the transition between the monsoons, on a boat that rewards a light touch and punishes a heavy one.

352 nmdistance
2 d 16 htime at sea
5.5 knaverage speed
40 fttrimaran
Maymonsoon transition
Captainrole

The brief

Take a Rapido 40 performance trimaran from Hong Kong to Kaohsiung in southern Taiwan. The route runs east across the northern South China Sea to the southern approaches of the Taiwan Strait. In May the northeast monsoon has faded and the southwest monsoon has not yet set in, so winds are usually lighter and thunderstorms more frequent.

Why a trimaran is different

A performance trimaran is light and fast, and it does not heel to warn you when it is carrying too much sail. On a boat like this, sail has to be reduced by the numbers, not by feel: reefing limits by true wind speed agreed with the crew before departure, the mainsheet kept in hand in squally weather, weight kept low and central, and the floats, nets and beams checked regularly.

At sea

We covered 352 miles in 2 days and 16 hours, an average of 5.5 knots. The aim on delivery is not speed. It is to keep loads down, protect the sails and arrive with nothing broken.

View from the trampoline of a Rapido 40 trimaran under full main on a calm, sunny sea

Why it matters to owners

A performance multihull is delivered differently from a cruising boat. It needs a captain who has sailed fast boats and knows where their limits are. That is the approach I bring to every race-boat and multihull delivery. See performance and race-boat deliveries.

Distance and time from the ship’s log. The yacht and owner are not named, for privacy.

Tell me the boat, the route and the window.

I’ll come back with a passage plan and a clear quote within 48 hours (or within 48 hours of reaching port if I’m on passage): day rate or lump sum, with expenses at cost.

Request a passage plan